Six stages, five gates: at each gate, management decides on the basis of clear deliverables whether the project is ready for the next step, with engineering, planning, cost and people maturing together, before the money is spent.
The most important decision is Gate 3, the Final Investment Decision: after it, changes become expensive. The depth of each stage is scaled to the size and risk of the project, and fitted to the client’s own procedures.
Stage 1
Opportunity
Gate 1: Pursue?Every assignment starts with listening: to the business need, the constraints, the stakeholders and the real question behind the request. Documents are reviewed, the site is visited and the people involved are interviewed.
Challenges
The request often describes a solution rather than the real problem, and the people who will operate the result are not always heard.
Risks
Starting on the wrong question; missing a shutdown window, permit or safety requirement; underestimating the people affected.
Consequences if missed
Budget spent on a solution that does not solve the problem, late resistance, and a business case that falls apart in the next stage.
Stage 2
Feasibility and Select
Gate 2: SelectTechnical options are studied and compared on equal terms: cost, risk, schedule, safety, operability and the impact on people. The preferred concept is selected together with the decision makers.
Challenges
Pressure to commit to a budget before the scope is clear; complex interfaces; options that are hard to compare.
Risks
Optimistic estimates without explicit uncertainty; hidden assumptions; an option chosen on investment cost alone.
Consequences if missed
A concept that is expensive to build or operate, decisions management later regrets, and rework in the next stage.
Stage 3
Define and Plan
Gate 3: Final Investment DecisionThe selected concept is engineered far enough to freeze the scope, estimate the cost with confidence and plan the execution in detail. This is the stage that decides whether a project can be delivered on time and within budget.
Challenges
Fitting the work around production and short shutdown windows, and aligning engineering, procurement, operations and maintenance in one plan.
Risks
A scope not frozen in time; unrealistic schedules; long-lead items arriving after the shutdown; a contracting strategy that does not match the risk profile.
Consequences if missed
Scope creep and expensive changes during execution, missed shutdown windows, idle contractors and cost overruns.
Stage 4
Execute
Gate 4: Ready for commissioning?Engineering, procurement and construction are coordinated as one integrated plan, with transparent reporting on cost, time, quality and safety, and every scope change through formal change control.
Challenges
Coordinating many disciplines and contractors while the plant keeps running, and keeping safety first under schedule pressure.
Risks
Late engineering deliverables; late interface issues; uncontrolled changes; reports with planned instead of real figures; incidents during simultaneous operations.
Consequences if missed
Surprises at the end, overruns visible too late, contractor claims, safety and quality issues, and lost trust.
Stage 5
Commission and Hand over
Gate 5: Accept and hand overPre-commissioning, loop checks, functional testing and commissioning, followed by training, as-built documentation and support until operations and maintenance truly own the installation.
Challenges
Testing under time pressure and completing documentation while the team is already moving on.
Risks
Incomplete tests; documentation not as built; operators not trained or confident; open punch list items without owners.
Consequences if missed
Start-up problems and unplanned downtime, an installation operations does not trust, and higher maintenance costs.
Stage 6
Close-out
Project closedThe project is closed cleanly: punch list completed, contracts and orders closed, final account settled, spares and warranties transferred, lessons learned captured and the expected benefits reviewed.
Challenges
Attention moves to the next project while the last items are still open.
Risks
Open purchase orders and late invoices; unresolved claims; warranties nobody owns; lessons never captured.
Consequences if missed
Costs that keep arriving after closure, disputes months later, and the same mistakes in the next project.